If AeroBarrier is applied at rough-in or right after drywall is installed, there in very minimal preparation required. Vertical surfaces like walls and windows require no covering. All designed openings, such as ducts, electrical and plumbing, need to be covered prior to sealing. All finished horizontal surfaces need to be protected. Contact Us if your project has special circumstances.